Brisbane - Ovation of the Seas (9 days)

9 days / 8 nights
5 ports of call
From €1,145 per person

Highlights

  • 5 exceptional ports of call
  • Full board on board
  • Entertainment and shows
  • 11 restaurants

Description

Découvrez l'Océanie

Cette croisière vous emmène à la découverte de l'Océanie lors d'une traversée exceptionnelle de 9 jours.

Votre voyage

Au départ de Brisbane, l'Ovation of the Seas vous emmène vers Brisbane, Mystery Island, Port Vila et Royal Beach Club Lelepa.

Votre programme

  • Jour 1 : Brisbane
  • Jour 3 : Mystery Island
  • Jour 5 : Port Vila
  • Jour 7 : Royal Beach Club Lelepa
  • Jour 9 : Brisbane

Votre confort à bord

À bord de l'Ovation of the Seas, Royal Caribbean met tout en œuvre pour rendre votre croisière inoubliable.

Itinerary

Departure
Day 1

Brisbane

Australia

Gateway to the Great Barrier Reef

At sea

Day at sea - Sailing

Make the most of the ship's facilities during this day at sea.

Stop 1

Mystery Island

Vanuatu

Îlot paradisiaque entre plage de rêve, snorkeling exceptionnel et simplicité mélanésienne

At sea

Day at sea - Sailing

Make the most of the ship's facilities during this day at sea.

Stop 2

Port Vila

Vanuatu

Port de croisière au Vanuatu

At sea

Day at sea - Sailing

Make the most of the ship's facilities during this day at sea.

Stop 3

Royal Beach Club Lelepa

Vanuatu

Port de croisière au Vanuatu

At sea

Day at sea - Sailing

Make the most of the ship's facilities during this day at sea.

Arrival
Day 9

Brisbane

Australia

Gateway to the Great Barrier Reef

4 days at sea

This cruise includes 4 days sailing on the open sea. Make the most of them to relax and discover everything the ship has to offer: pools, restaurants, bars, spa, entertainment and shows are all waiting to make your voyage unforgettable.

The ship

Ovation of the Seas

Royal Caribbean

View the ship
A Royal Caribbean Quantum-class ship, delivered in 2016 and refurbished in 2026: North Star capsule, skydiving simulator and the Two70 lounge.
4182 passengers
2091 cabins
Built in 2016